Project 1: End-to-End BW/4HANA Data Model


Objective

Design and implement a complete LSA++-based BW/4HANA data model.


Scope

  • InfoObjects (Characteristics, Key Figures)
  • Staging aDSOs
  • Harmonized Standard aDSOs
  • CompositeProvider
  • BW Query

Architecture

Source System

Staging aDSO

Harmonized aDSO

CompositeProvider

BW Query

Key Deliverables

  • Reusable InfoObjects
  • Clean aDSO design
  • Semantic CompositeProvider
  • Optimized BW Query
Evaluation Criteria

Correct layering
Reusability
Pushdown compliance


Project 2: S/4HANA to BW Extraction

Objective

Implement ODP-based extraction from S/4HANA into BW/4HANA.


Scope

  • Source system connection
  • ODP DataSource selection
  • Delta initialization
  • Data load into staging aDSO

Key Concepts Applied

  • ODP delta framework
  • Request lifecycle
  • Error handling

Deliverables

  • Working delta-enabled extraction
  • Validated data consistency
  • Load monitoring documentation
Real-World Focus

This mirrors 90% of BW data acquisition projects.


Project 3: Performance Optimization Project

Objective

Identify and fix performance bottlenecks in an existing BW model.


Given (Simulation)

  • Slow BW Query
  • Large data volumes
  • Complex joins

Tasks

  • Analyze BW Analyzer
  • Review RSRT
  • Check HANA execution plan
  • Redesign model if required

Expected Outcome

  • Reduced query runtime
  • Improved pruning
  • Optimized CompositeProvider
tip

Performance tuning is design refactoring, not parameter tweaking.


Project 4: BW + SAP Analytics Cloud (SAC) Analytics Solution

Objective

Build an enterprise analytics solution using BW/4HANA + SAC (Live).


Scope

  • BW Query optimized for SAC
  • Live connection setup
  • SAC story design
  • Security validation

Architecture

BW Query
↓ Live Connection
SAP Analytics Cloud

Dashboards & Stories

Deliverables

  • Live SAC dashboard
  • Secure role-based access
  • Performance-optimized story
Interview Value

This project is highly valued in modern BW interviews.


Project 5: BW to BW/4HANA Migration Simulation

Objective

Simulate a classic BW to BW/4HANA migration.


Scope

  • Identify deprecated objects
  • Replace legacy objects
  • Adapt custom code
  • Validate post-migration behavior

Tasks

  • InfoCube → aDSO conversion
  • MultiProvider → CompositeProvider
  • SPRO cleanup checklist
  • Migration validation report

Deliverables

  • Migration approach document
  • Object replacement mapping
  • Risk & mitigation list
tip

Migration success depends more on cleanup than conversion tools.


Final Evaluation Checklist

Capstone Completion Criteria

Correct architectural decisions
Performance-aware modeling
Clean core principles
Clear documentation


How to Present These Projects (Interview Tip)

Explain:

  • Business requirement
  • Design choice
  • Why this approach
  • Performance & scalability

Course Completion Summary

By completing these capstone projects, you demonstrate:

  • End-to-end BW/4HANA expertise
  • Real-world architectural thinking
  • Performance tuning capability
  • Modern analytics integration
  • Migration readiness
Learning Tip