Module 31: BW/4HANA Capstone Projects (BW/4HANA 2.0)
Capstone projects simulate real enterprise BW/4HANA scenarios.
They test not only technical skills, but also architecture thinking, performance awareness, and design discipline.
This module contains 5 end-to-end projects, each focusing on a critical BW capability.
Project 1: End-to-End BW/4HANA Data Model
Objective
Design and implement a complete LSA++-based BW/4HANA data model.
Scope
- InfoObjects (Characteristics, Key Figures)
- Staging aDSOs
- Harmonized Standard aDSOs
- CompositeProvider
- BW Query
Architecture
Source System
↓
Staging aDSO
↓
Harmonized aDSO
↓
CompositeProvider
↓
BW Query
Key Deliverables
- Reusable InfoObjects
- Clean aDSO design
- Semantic CompositeProvider
- Optimized BW Query
Correct layering
Reusability
Pushdown compliance
Project 2: S/4HANA to BW Extraction
Objective
Implement ODP-based extraction from S/4HANA into BW/4HANA.
Scope
- Source system connection
- ODP DataSource selection
- Delta initialization
- Data load into staging aDSO
Key Concepts Applied
- ODP delta framework
- Request lifecycle
- Error handling
Deliverables
- Working delta-enabled extraction
- Validated data consistency
- Load monitoring documentation
This mirrors 90% of BW data acquisition projects.
Project 3: Performance Optimization Project
Objective
Identify and fix performance bottlenecks in an existing BW model.
Given (Simulation)
- Slow BW Query
- Large data volumes
- Complex joins
Tasks
- Analyze BW Analyzer
- Review RSRT
- Check HANA execution plan
- Redesign model if required
Expected Outcome
- Reduced query runtime
- Improved pruning
- Optimized CompositeProvider
Performance tuning is design refactoring, not parameter tweaking.
Project 4: BW + SAP Analytics Cloud (SAC) Analytics Solution
Objective
Build an enterprise analytics solution using BW/4HANA + SAC (Live).
Scope
- BW Query optimized for SAC
- Live connection setup
- SAC story design
- Security validation
Architecture
BW Query
↓ Live Connection
SAP Analytics Cloud
↓
Dashboards & Stories
Deliverables
- Live SAC dashboard
- Secure role-based access
- Performance-optimized story
This project is highly valued in modern BW interviews.
Project 5: BW to BW/4HANA Migration Simulation
Objective
Simulate a classic BW to BW/4HANA migration.
Scope
- Identify deprecated objects
- Replace legacy objects
- Adapt custom code
- Validate post-migration behavior
Tasks
- InfoCube → aDSO conversion
- MultiProvider → CompositeProvider
- SPRO cleanup checklist
- Migration validation report
Deliverables
- Migration approach document
- Object replacement mapping
- Risk & mitigation list
Migration success depends more on cleanup than conversion tools.
Final Evaluation Checklist
Correct architectural decisions
Performance-aware modeling
Clean core principles
Clear documentation
How to Present These Projects (Interview Tip)
Explain:
- Business requirement
- Design choice
- Why this approach
- Performance & scalability
Course Completion Summary
By completing these capstone projects, you demonstrate:
- End-to-end BW/4HANA expertise
- Real-world architectural thinking
- Performance tuning capability
- Modern analytics integration
- Migration readiness
Projects speak louder than certifications.